lob is numerical software, and numerical software cannot be correct by inspection. What it can do is be honest about what has been measured, what has not, and where the difference matters. This page is that inventory.
No accuracy claim is made that is not backed by a test or a measurement, and the wording of a claim mirrors the tolerance it was measured against rather than rounding up to something more impressive.
That rule has consequences that run through everything below. There is no single accuracy figure for lob, because there is no single answer to give. There is a set of claims, each scoped to the case it was measured on.
Accuracy is only meaningful against something external, and lob uses three sources.
The drag tables come from Ballistic Research Laboratory work, published through JBM. The spline representation is checked against the full tables rather than against a sample of them, with a measured worst-case budget across the whole Mach range and every standard curve.
Reference trajectories cover the atmosphere rather than one nominal case. A standard-atmosphere baseline and an altitude case are joined by three that each break the model in a different way: a hot, low-pressure day with thin air, a barometer reading taken somewhere other than the shooter's altitude, and a case supplying pressure, temperature and humidity together. A weather-station case exercises the corrections a real reading needs. Each carries its own expected values, transcribed out of the environment tests along with a record of where they came from. Each case bounds velocity, energy, angle and time of flight over a range out to a thousand yards.
The spin corrections are checked against the published papers they were taken from, which is the only check available for them.
A solver that converges to the wrong answer is worse than one that does not converge, so refinement is tested as a property rather than assumed.
The core test is that halving the step must reduce error, monotonically, on the same trajectory. That is a real claim about the code and it is enforced in continuous integration. What it does not give you is an absolute accuracy, which is why the ceilings beside it are curated per case rather than derived.
Those per-case values are called error floors, and treating them per envelope cell rather than as one library-wide number is the important design decision. A trajectory through a hot, high, fast regime and a trajectory through a cool, sea-level, slow one are different problems, and a single accuracy figure covering both would be a claim about neither. The floor is per cell and per output, and a caller working in one regime can read the number that applies to them.
Sensitivity analysis answers a different question: not how accurate is the answer, but which inputs the answer is most exposed to. Perturbing one input at a time and ranking the effect tells a caller where their own measurement effort should go, and it is measured rather than assumed.
Some of this feeds a further step. A budget combines the sensitivities, the numerical floors, and the residuals against reference data into a single uncertainty per cell. The machinery for that combination exists and is tested.
What the machinery cannot yet do is produce a number anyone should quote, because an uncertainty budget is only as good as the uncertainties going into it, and the input uncertainties, muzzle velocity scatter, sensor error, the input tables themselves, have not been supplied with evidence attached. The schema reserves the fields and the combiner is proven, but the honest state is that the budget is not yet a budget. No combined uncertainty is claimed anywhere.
Sampling input distributions through the unchanged deterministic solver propagates input uncertainty to output uncertainty, and runs offline and reproducibly from a fixed seed.
Two things about its scope. It lives in a desktop tool rather than in the library, because sampling is not something an embedded caller or a real time caller asked for and should not pay for. And its distributions are synthetic for the same reason the budget has no numbers: the shape is known, the data behind the shape is not.
The hardest question in any of this is whether a change in the answer is real or is the solver's own resolution. Comparing two results is only meaningful relative to how precisely the solver can produce either one.
So observed changes are divided by the solver's own measured resolution and reported in bands: clearly distinguishable, marginal, or indistinguishable. The verdict is deliberately resolution-relative and is not a claim about statistical significance of prediction error. That distinction matters, because a solver can be entirely reproducible and still be unable to resolve an effect, and saying so is more useful than a confident number.
Continuous integration runs linting, sanitizers, coverage, and the test suite across several operating systems and both shared and static builds, plus a benchmark that tracks instruction counts so a change to the hot path shows up as a regression rather than as a surprise later.
The test suite mirrors the source layout, so an area that gains a production file is expected to gain matching tests.
This is the section that matters most, and it is not exhaustive because the list is long and it grows honestly.
There is no field data. Accuracy is anchored on published tables and on reference trajectories, some of them borrowed. Nobody has fired lob's outputs against measured impacts from an actual range session.
Long range is anchored on standard conditions. Accuracy at extreme range currently rests on the atmosphere the builder assumed, not on conditions observed at that range.
Input uncertainties are absent. Every number in the uncertainty budget is waiting on a human to supply the evidence behind an input.
Every claim is marked provisional. The curated claim rows carry a pending sign-off, and the long-range and field cells are explicitly unclaimed rather than provisionally claimed.
Performance is tracked, not gated. Instruction counts are monitored for regression, but there is no performance budget that fails a build.